?????? ????????? ???????????? ????? (2015)
- TURN KEY Very Small Power Plant 9.9 MW completed with Turbine-Generator 10 MW, and Bagasse Fuel Steam Boiler 110 TPH 42 Barg 510 oC
?????? ????????? ???????? ????? (2015)
- MEI Supply of bagasse firing travelling grate200 TPH 42 BARG 460 °C Boiler Equipment2 UNITS
??????????????????? (2014)
- Electrostatic Precipitator (ESP) for 120 TPH Boiler x 1 Unit
?????? ????????????????? ????? (2014)
- TURN KEY Very Small Power Plant 9.9 MW completed with Turbine-Generator 10 MW, and Bagasse Fuel Steam Boiler 100 TPH 42 Barg 500oC
??????????????????? (2014)
- Upgrading Bagasse Firing Boiler 80 T/H to be 110 T/H, 32 Kg/Cm2 (G) 360 oC, and Modification of Economizer System Completed with Electrostatic Precipitator (ESP)
??????????????????? (2014)
- Upgrading Bagasse Firing Boiler 80 T/H To be 110 T/H, 22 Kg/Cm2(G) 360oC - Modification of Economizer System for Bagasse Firing Boiler 200 T/H 22 Kg/Cm2 (G) 360OC Completed with Electrostatic Precipitator (ESP) for Boiler 200 T/H
??????????????????? (2013)
- MEI Work of Bagasse Firing Boiler 200 t/h 45 kg/cm2 (g), 3600c Pinhole Grate Type x 1 Unit - Electrostatic Precipitator (ESP) for Boiler 50 TPH x 3 units - Electrostatic Precipitator (ESP) for 120 TPH Bagasse Boiler x 3units
????????????????????? ????? (2013)
- Electrostatic Precipitator (ESP) for 120 TPH Boiler with x 1unit
??????????????????? (2013)
- MEI Supply of Economizer system and Electrostatic Precipitator (ESP) for 120 TPH 30 kg/cm2 (g),360oc Boiler x 1 Unit. - MEI Supply of Economizer system and Electrostatic Precipitator (ESP) for 200 TPH 30 kg/cm2 (g),360oc Boiler x 1 Unit.
??????????????????? (2013)
- MEI Supply of Economizer system and Electrostatic Precipitator (ESP) for 80 TPH 22 kg/cm2(g), 360oc Boilers x 2 sets
?????? ????????????????????? ????? (2013)
- MEI Work of Bagasse Firing travelling grate 220 TPH 70KG/CM2(g) 510oc BOILER EQUIPMENT 1 UNIT
?????? ????????????????????? ?????(2011-2012)
- Pin Hole Grate Steam Boiler 200 t/h, 45 Bar g/360°C x 1Unit
?????? ????????????????????? ????? (2011-2012)
- Traveling Grate Steam Boiler 150 TPH , 42 Bar g/460°Cx2Units
?????? ????????? ??????? ????? (2011-2012)
- TURN KEY Very Small Power Plant 9.9 MW completed with Turbine-Generator 10 MW, and Bagasse Fuel Steam Boiler 85 TPH 42 Barg 510 C
?????? ????? ???? ?????(2007)
- Installation and commissioning of Coal Firing Hot Oil Boiler 2,000,000 kcal/hr with fuel handling and hot oil piping system.
?????? ?????????????????? ????? (2007)
- Supervisory, Supply for control equipment of boiler, ESP.
?????? ??????? ???????????? ?????(2007)
- Supervisory and commissioning of 6000 kw Condensing Steam Turbine and Generator.
???????????? ?????? (2007)
- Design, fabrication and installation of paddy dryer heat exchanger with piping - - Modify mechanic governor to electronic governor (woodward 505)
??????????????????????????? ????? (2007)
- Steam Boiler 80 t/h , 26 Bar g/390°C x2Units. - MEI Supply of Bagasse firing travelling grate 150TPH x2 Units.
?????? ????? ???? ????? (2006-2007)
-Installation and commissioning of Coal Firing Hot Oil Boiler 2,000,000 kcal/hr with fuel handling and hot oil piping system.
?????? ??? ?? ?????? ????? (2006-2007)
-Installation and commissioning of Coal Firing Hot Oil Boiler 14,000,000 kcal/hr with fuel handling and hot oil piping system.
???????????? ?????? (2006)
–Engineering, Design work –Modify Boiler to improve more efficiency (draft and combustion system, dust collecting system) –Installation and commissioning TG 1,500 kW, Cooling tower, electrical system, interconnecting and selling to PEA
???????????? ?????? (2005)
- Condensing Steam Turbine and Generator 1,500 kW 6300V - China